Projects
- UNIVERSIDAD LAS ROZAS UDIMA.
(2008-2009) Construction of Academic Buildings. Budget: €12.088.199,66. Collado Villaba, Madrid, Spain. - CENTRO POLIDEPORTIVO COSLADA.
(2007-2009). Construction of a sports center in Coslada. Budget €33.000.485,19. Location: Coslada, Madrid, Spain. - CENTRO DE ESPECIALIDADES MEDICAS VIRGEN DEL VAL.
(2005-2007). Budget: €14.389.329,43. Construction of a specialized medical center focused on remote radiodiagnostics Location: Alcalá de Henares, Madrid, Spain. EMBAJADA DE KUWAIT.
(2005-2006). Construction of the diplomatic complex and official residence for the Ambassador of the State of Kuwait. Budget: €10.478.094,25. Location: Madrid, Spain.- TERMINAL 4. MADRID-BARAJAS AIRPORT.
(2000-2006) Budget. €911.627.905,49. Construction of the Terminal Building located at the northern end of Adolfo Suárez Madrid Airport, including runways and satellite building. - PHASE I “HOSPITAL GENERAL DE TOLEDO”.
Budget: €299.760.234,88. Location: Toledo, Spain. - BBVA HEAD QUARTER.
Budget: €163.359.211,95. Location. Madrid, Spain. - FIRST LINE OF THE METRO SYSTEM IN QUITO.
(2016-2023). Budget: $1,692,099,448.86. Location: Quito, Ecuador. - METRO LINE 2 – PANAMA CITY.
(2015-2018). Budget $1.8 billion. Location: Panama City. - METRO LINE 1 – PANAMA CITY.
(2010-2016). Budget: $2 billion. Location: Panama City. - CABINDA OIL REFINERY.
(2023–Present). Budget. $1 billion (estimated). Location: Angola. - ORINOCO MIXED BRIDGE SYSTEM.
(2001-2007). Budget: $1.2 billion.Location. Venezuela. - DAULE–SANTA ELENA WATER TRANSFER SYSTEM.
Budget: $670 million. Location: Ecuador.